As always, click on the thumbnail to view full size, and "Back" button on your browser to return to this page. Scroll down in each section to see latest photos.

Library (scroll down for most recent images)
5/22/07 The moveable shelving for the library stacks arrived is workers have begun installation in Government Documents.  Some stacks were also moved to accommodate the new stairway and lift.
IMG_2331.JPG (979228 bytes) IMG_2333.JPG (213339 bytes) IMG_2334.JPG (1061388 bytes) IMG_2335.JPG (945570 bytes) 
5/29/07 Some of the new shelving units are now working and book moving continues.
IMG_2349.JPG (1195588 bytes) IMG_2352.JPG (237852 bytes) IMG_2353.JPG (255094 bytes) 
6/05/07 Some walls have been demolished and shelving disappeared.  Air conditioning ducts are being put into place.
IMG_2401.JPG (1084099 bytes) IMG_2402.JPG (1128189 bytes) IMG_2405.JPG (1096361 bytes) IMG_2407.JPG (1142294 bytes)
6/12/07 Work continues in the lower level.  The tracks for moveable shelving can be seen.  Shelves of books have been covered to protect the from the dust and other moved out.
IMG_2419.JPG (901583 bytes) IMG_2420.JPG (972550 bytes) IMG_2424.JPG (1006486 bytes) IMG_2426.JPG (1034519 bytes)
6/19/07 Electrical work goes on as new lights are installed.  The walls also have a fresh coat or paint.
IMG_2450.JPG (1092778 bytes) IMG_2451.JPG (1107782 bytes) IMG_2453.JPG (956604 bytes)
7/2/07 Carpet was laid and more shelving units have been installed.  Prep work has been going on for the floor cut for new lift and stairway.
IMG_2624.JPG (981837 bytes) IMG_2625.JPG (1025451 bytes) IMG_2628.JPG (1034422 bytes)
7/9/07 The shelving units continue to go in and some of the books have been place on shelves, while more go out for storage.  A hole in the ceiling is the start of the new lift and staircase.
IMG_2674.JPG (1034265 bytes) IMG_2676.JPG (1096104 bytes) IMG_2677.JPG (1070507 bytes) IMG_2697.JPG (801657 bytes)
7/17/07 The hole got bigger this week!  Books, bound periodicals have been moved and shelving been removed in preparation for paint and new shelves.
IMG_2714.JPG (919299 bytes) IMG_2715.JPG (953079 bytes) IMG_2716.JPG (937610 bytes) IMG_2717.JPG (1021682 bytes)
7/25/07 The rest of the old shelves were removed from the lower level.  Painters have been busy and duct work and electrical work is in progress.
IMG_2769.JPG (1069862 bytes) IMG_2770.JPG (1040975 bytes) IMG_2773.JPG (962067 bytes) 
7/31/07  The masonry work for the lift and new stairway is almost complete.  Electricians are wiring for new lights. 
IMG_2880.JPG (1197187 bytes) IMG_2881.JPG (1128354 bytes) IMG_2882.JPG (1223293 bytes) IMG_2885.JPG (1189793 bytes)
8/08/07 Carpet was laid and shelving built for periodical storage.  New lights also make quite a difference. Some of the bound periodicals are being moved back.
IMG_2956.JPG (264787 bytes) IMG_2957.JPG (881698 bytes) IMG_2958.JPG (1097109 bytes) IMG_2959.JPG (1058893 bytes)
8/15/07 The first floor stack have al been removed and a new window is in place. More shelving has been installed and the west side.  The new stairway is in place.
IMG_2984.JPG (207282 bytes) IMG_2986.JPG (990644 bytes) IMG_2989.JPG (1097272 bytes) IMG_2990.JPG (932503 bytes) IMG_2991.JPG (1042216 bytes) 
8/23/07 Work on the lift and stairs continue.  More books are back on the shelves.
IMG_3146.JPG (976923 bytes) IMG_3147.JPG (232472 bytes) IMG_3149.JPG (891971 bytes) IMG_3150.JPG (1131785 bytes)
8/30/07 Projects continue in the library lower level.
IMG_3238.JPG (1003996 bytes) IMG_3240.JPG (1074590 bytes) IMG_3241.JPG (943242 bytes) IMG_3242.JPG (221389 bytes) IMG_3244.JPG (164728 bytes)
9/07/07 Work continues...the new lounge area can be seen and the lift is nearing completion.  Books have been moved from the first floor area next to the reference room.
IMG_3395.JPG (199641 bytes) IMG_3399.JPG (1013669 bytes) IMG_3401.JPG (239599 bytes) IMG_3402.JPG (185009 bytes) 
9/21/07 The reading lounge in the lower level nears completion.  Books continue to be shelved and the shelves in the area north of the reference room have been removed to be work in this study area.
IMG_3687.JPG (1072649 bytes) IMG_3684.JPG (1094705 bytes) IMG_3685.JPG (953068 bytes) IMG_3686.JPG (1257568 bytes) IMG_3689.JPG (271237 bytes)
9/27/07 Some of the books from the northeast stacks room have been removed in preparation for work here.              
IMG_4404.JPG (967453 bytes) 
10/5/07 Almost all the books have been cleared out of the northeast corner of the library.
IMG_4439.JPG (966473 bytes) IMG_4440.JPG (989700 bytes) 
10/12/07 The shelving in the back room has been removed and some duct work can be seen.
IMG_5140.JPG (977471 bytes) IMG_5141.JPG (934804 bytes) IMG_5143.JPG (188409 bytes)
11/2/07 Framing for the new classroom in the north-east corner of the library.  Some electrical and HVAC work in the study area.
IMG_6051.JPG (312247 bytes) IMG_6053.JPG (961480 bytes) IMG_6054.JPG (873230 bytes)
11/09/07  The drywall has gone up in the classroom area and a coat of paint in the study area.
IMG_6368.JPG (1005795 bytes) IMG_6371.JPG (919289 bytes) IMG_6373.JPG (921428 bytes) IMG_6374.JPG (907512 bytes) 
11/16/07 Work continues in the new classrooms 
IMG_6710.JPG (205558 bytes) IMG_6711.JPG (1021409 bytes)
11/29/07 Work continues in the new study area behind the reference area and in the new classroom in the back of the library.
IMG_6761.JPG (990800 bytes) IMG_6766.JPG (258376 bytes) IMG_6764.JPG (976745 bytes) IMG_6762.JPG (916422 bytes)
12/7/07 The ceiling and lighting in new study is now complete.  The new classrooms have been painted.
IMG_6951.JPG (236486 bytes) IMG_6957.JPG (230512 bytes) IMG_6953.JPG (207080 bytes) IMG_6955.JPG (888221 bytes) 
12/14/07 Carpet was laid on the study area and the track lights (for art displays) were installed.  The classroom/study area ceiling was also installed.
IMG_7059.JPG (212922 bytes) IMG_7060.JPG (1033438 bytes) IMG_7062.JPG (979016 bytes) IMG_7063.JPG (1017095 bytes)
12/20/07 Furniture was moved into the new study area.  In the classroom/study areas, lights  and projectors were installed and the carpet is being installed as well.
IMG_0105.JPG (1220453 bytes) IMG_0109.JPG (257192 bytes) IMG_0110.JPG (216530 bytes) IMG_0111.JPG (289290 bytes) 
1/04/08 The library project is nearing completion.  All the carpet had been installed, some paintings appeared in the study area and some furniture was placed in the conference rooms. 
IMG_0192.JPG (237703 bytes) IMG_0185.JPG (1531886 bytes) IMG_0186.JPG (1338270 bytes) IMG_0180.JPG (1205418 bytes) IMG_0191.JPG (1220075 bytes) 
1/11/08 Study carrels arrived and the conference room furniture is in.  Students are making use of the gallery space.
IMG_0331.JPG (1250796 bytes) IMG_0332.JPG (1163615 bytes) IMG_0333.JPG (1314730 bytes) IMG_0334.JPG (267028 bytes)

                                                                          
Theater (scroll down for most recent photos)
5/22/07 The scaffolding is being built so workers can begin painting.  Backstage is prepped for new fly system and electrical work.
IMG_2337.JPG (1059046 bytes) IMG_2338.JPG (234243 bytes) 
5/29/07  Scaffolding is almost completed ready to be used for painting.                      
 IMG_2354.JPG (1215375 bytes) IMG_2356.JPG (1177758 bytes)
6/05/07 A view from the top.  The ceiling is being prepped for painting.
IMG_2397.JPG (907768 bytes) IMG_2398.JPG (943937 bytes) IMG_2400.JPG (1121480 bytes)
6/12/07 Some plaster work and priming being done on the theater ceiling.
IMG_2416.JPG (203824 bytes) IMG_2417.JPG (197535 bytes) 
 6/19/07 The painters have started on the walls.  The ceiling has been prepped for paint as well.
IMG_2445.JPG (797140 bytes) IMG_2446.JPG (817680 bytes) IMG_2449.JPG (1079246 bytes)
7/0/07 The ceiling is taking shape and the old theater seats have been removed.  A sample of some of the detail work in progress.
IMG_2629.JPG (1047452 bytes) IMG_2632.JPG (941870 bytes) IMG_2633.JPG (981683 bytes) IMG_2631.JPG (870061 bytes) IMG_2636.JPG (239937 bytes)
7/9/07 The ceiling looks pretty well finished, except for some finishing touches. Painters are now working on some of the detail work.
IMG_2665.JPG (795331 bytes) IMG_2669.JPG (1124486 bytes) IMG_2673.JPG (151610 bytes) 
7/17/07 More finish work and stenciling on the ceiling and decorative columns.
IMG_2719.JPG (971336 bytes) IMG_2720.JPG (793844 bytes) IMG_2721.JPG (801122 bytes) IMG_2722.JPG (817881 bytes) IMG_2723.JPG (151238 bytes)
7/25/07 More finish work is going on now.  The ceiling is almost completed.
IMG_2775.JPG (869748 bytes) IMG_2779.JPG (189927 bytes) IMG_2776.JPG (822408 bytes) IMG_2777.JPG (857016 bytes)  
7/31/07 The scaffolding is beginning to go down as the ceiling is done. The painters are finishing up the walls and other touch up work.
IMG_2874.JPG (1136151 bytes) IMG_2876.JPG (971277 bytes) IMG_2879.JPG (1245595 bytes)
8/08/07 The scaffolding is coming down.  Here's some shots of the new look.
IMG_2960.JPG (1005550 bytes) IMG_2962.JPG (1046095 bytes) IMG_2963.JPG (941918 bytes) IMG_2964.JPG (934268 bytes) IMG_2965.JPG (963580 bytes)
8/15/07 Workers prepping the floor for new carpeting.  Electricians have been busy behind stage working in preparation for the new fly system and other electrical wiring. The final shot shows some of the new motorized fly system.
IMG_2988.JPG (951830 bytes) IMG_2992.JPG (1006865 bytes) IMG_2993.JPG (1368118 bytes) 
8/23/07 The rigging in the fly area is beginning to take shape.  The floor (where the seats will be placed) was painted.
IMG_3143.JPG (232965 bytes) IMG_3142.JPG (271660 bytes) IMG_3151.JPG (1026632 bytes)
8/30/07 Waiting for carpet and seats in the theater.  Installation of  fly system backstage continues.
IMG_3251.JPG (895159 bytes) IMG_3254.JPG (1219849 bytes) IMG_3257.JPG (266683 bytes) IMG_3255.JPG (1138261 bytes)
9/07/07 Most of the rigging in the fly area was completed this past week.

IMG_3404.JPG (304593 bytes) 

9/14/07 Little lights in the aisles of the theater and another look at the rigging in the fly area of the stage.
IMG_3603.JPG (874397 bytes) IMG_3604.JPG (296535 bytes)
9/27/07 The new seats have arrived and workers have begin installation. 
IMG_4405.JPG (1030944 bytes) IMG_4406.JPG (1020331 bytes)
10/5/07 All the seats were installed in the theater and some new sconces are visible on the walls. 
IMG_4444.JPG (848598 bytes)  
12/14/07 The proscenium curtain arrived this week.
IMG_7056.JPG (1043397 bytes) IMG_7057.JPG (1017917 bytes) IMG_7058.JPG (1047692 bytes)
12/20/07 The rest of the curtains and rigging were installed.  Welcome to the back-stage view.
IMG_0118.JPG (221994 bytes) 

  

Go  to Under Construction Page ] [Saint Joseph's College Page ]