Fieldhouse  (scroll down for most recent images)
5/22/07  
IMG_2344.JPG (1198707 bytes)
5/29/07  The old floor boards have been taken up and workers are now removing subfloor.
 IMG_2366.JPG (1228661 bytes) IMG_2368.JPG (1345129 bytes) IMG_2370.JPG (1228412 bytes)  
6/05/07  Work continues on the back court.  While the old subfloor continues to be torn up, new subfloor is being installed.  The hall connecting the Rec Center also received a new look.
IMG_2412.JPG (1373918 bytes) IMG_2413.JPG (1248499 bytes)   IMG_2415.JPG (1011120 bytes) 
6/12/07 Almost all the old subfloor has been torn up and the new plywood subfloor has been laid out.
IMG_2427.JPG (1215699 bytes) IMG_2428.JPG (1241263 bytes) IMG_2430.JPG (1247519 bytes)
6/19/07 The new subfloor is down and now work begins in the hardwood floor.
IMG_2454.JPG (1061455 bytes) IMG_2456.JPG (1191342 bytes) IMG_2457.JPG (1312744 bytes)
7/2/07  The finishing touches are taking place on the hardwood floor.  Soon it will be time for finish work.
IMG_2641.JPG (906774 bytes) IMG_2643.JPG (813073 bytes) 
7/17/07 The first coat of sealer had been applied to the floor
IMG_2727.JPG (919450 bytes)
 
7/25/07 The lines were painted on the back court.
IMG_2785.JPG (951655 bytes)
7/31/07 The main court is being sanded and work is beginning on the mezzanine to make office space in this area. 
IMG_2891.JPG (963742 bytes) IMG_2895.JPG (1307808 bytes) IMG_2896.JPG (329430 bytes)
8/08/07 The main court is now being repainted.  Worker framed up the wall on the mezzanine level which will be some new offices.  Work has also progress on some of the plumbing for the new addition to the fieldhouse.
IMG_2972.JPG (254330 bytes) IMG_2973.JPG (1056538 bytes) IMG_2977.JPG (1036924 bytes) IMG_2970.JPG (1402726 bytes)
8/15/07 The dry wall is up on the mezzanine level and work had begun on the framing for the space.
IMG_2994.JPG (227607 bytes) IMG_2997.JPG (333076 bytes) IMG_2998.JPG (330757 bytes) IMG_3000.JPG (1424410 bytes) 
8/23/07 Electricians have been busy routing conduit throughout the new offices.  Duct work for the HVAC is also underway.
IMG_3152.JPG (867341 bytes) IMG_3155.JPG (341492 bytes) IMG_3156.JPG (355734 bytes) IMG_3157.JPG (350739 bytes) 
8/30/07 Work continues in the mezzanine level offices.  On the outside of the fieldhouse, trenches water lines for the new locker room addition were dug.  The outline for this new addition can be seen in the last photo.
IMG_3258.JPG (895260 bytes) IMG_3261.JPG (260233 bytes) IMG_3262.JPG (258999 bytes) IMG_3262.JPG (258999 bytes)
IMG_3237.jpg (346989 bytes) IMG_3267.jpg (343026 bytes) 
9/07/07 Work continues on the mezzanine offices.  A couple of concrete foundation "anchors" for the new locker room were also poured this week.
IMG_3411.JPG (240933 bytes) IMG_3413.JPG (306317 bytes) IMG_3416.JPG (1123545 bytes) IMG_3406.JPG (1071222 bytes) IMG_3408.JPG (347172 bytes) 
9/14/07 Work continues on the drywall in the mezzanine offices.  Preparations are made in the front of the Fieldhouse for the new addition.  Steel has arrived for the new locker room and workers prepared for the concrete floor.
IMG_3606.JPG (935888 bytes) IMG_3610.JPG (1032187 bytes) IMG_3611.JPG (869189 bytes) IMG_3615.JPG (246573 bytes) IMG_3620.JPG (297050 bytes) IMG_3624.JPG (168123 bytes) IMG_3625.JPG (1141127 bytes) 
9/21/07 Stucco has been placed in the top part of the field house.  The new addition will be below the stucco.  Work on the mezzanine offices continues. The foundation and footers for the new locker room have been poured.
IMG_3692.JPG (891193 bytes) IMG_3699.JPG (278443 bytes) IMG_3702.JPG (243622 bytes) IMG_3695.JPG (1278999 bytes) IMG_3697.JPG (1278928 bytes) IMG_3698.jpg (328249 bytes)
9/27/07 Several steel I-beams have been erected for the new locker room.  The offices in front of the fieldhouse...are no more.  Workers can been seen clearing out the old foundations.
IMG_4408.JPG (1021101 bytes) IMG_4410.JPG (1561703 bytes) IMG_4418.JPG (349997 bytes) IMG_4411.JPG (1276284 bytes) IMG_4413.JPG (1045623 bytes) IMG_4414.JPG (1202335 bytes)
9/28/07 More I-beams are hoisted into place.
IMG_4420.jpg (328935 bytes) IMG_4421.jpg (331124 bytes) IMG_4422.jpg (303033 bytes) 
10/5/07 The structural steel is complete for the new locker room and concrete foundations have been poured for the addition on the front of the fieldhouse.
IMG_4453.JPG (1153934 bytes) IMG_4454.JPG (1220589 bytes) IMG_4449.JPG (1299404 bytes) IMG_4450.JPG (1525284 bytes) IMG_4451.JPG (1029588 bytes)
10/12/07 Footers were poured in the front of the fieldhouse and plumbers installing drain lines in the locker room.
IMG_5147.JPG (1317779 bytes) IMG_5148.JPG (1489793 bytes) IMG_5149.JPG (1488080 bytes) IMG_5151.JPG (460240 bytes) IMG_5152.JPG (1325090 bytes) IMG_5153.JPG (1671439 bytes) IMG_5156.JPG (1640812 bytes)
11/2/07 Concrete has been poured for the floor of the east addition and some of the locker room floor is completed.  Some of the concrete block for the wall arrived as did a little "mortar factory"
IMG_6058.JPG (1185481 bytes) IMG_6059.JPG (1555393 bytes) IMG_6060.JPG (1048679 bytes) IMG_6062.JPG (1162879 bytes) IMG_6063.JPG (1099221 bytes) IMG_6061.JPG (1208008 bytes) 
11/09/07 Scaffolding arrived for masons to begin brick work.  The rest of the concrete floor for the locker was poured this week.
IMG_6363.JPG (1076505 bytes) IMG_6364.JPG (1063414 bytes) IMG_6365.JPG (988455 bytes) IMG_6366.JPG (1142003 bytes) IMG_6367.JPG (1166472 bytes)
11/16/07 Concrete blocks go up this week for the walls of the addition in front of the Fieldhouse.  Plumbing work, some roofing sheeting and duct work in the new football locker room.
IMG_6704.JPG (1066238 bytes) IMG_6713.JPG (974049 bytes) IMG_6720.JPG (1253382 bytes) IMG_6721.JPG (1169484 bytes) IMG_6716.JPG (980757 bytes) IMG_6715.JPG (1026294 bytes)
11/29/07 The cold weather has slowed down masonry work on the font of the fieldhouse.  Plumbers are busy at work in the new locker room installing the rough-in plumbing.
IMG_6751.JPG (1099490 bytes) IMG_6752.JPG (1414697 bytes) IMG_6754.JPG (1181161 bytes) IMG_6755.JPG (1390788 bytes) IMG_6759.JPG (976540 bytes) IMG_6760.JPG (1107206 bytes) 
12/7/07 Masonry work continues on the east addition to fieldhouse.  Steel for the floor also arrived. Plumbing in the locker room and the roof is now complete.
IMG_6947.jpg (297266 bytes) IMG_6948.jpg (284504 bytes) IMG_6961.JPG (1131116 bytes) IMG_6960.JPG (1179434 bytes) IMG_6959.JPG (1095391 bytes) IMG_6949.JPG (1045991 bytes)
12/14/07 Steel girders and trusses were hoisted in place this week and the masonry work continues.  Door frames arrived for the football locker room.
IMG_7044.jpg (248541 bytes) IMG_7040.JPG (970627 bytes) IMG_7047.jpg (332469 bytes) IMG_7049.JPG (1226473 bytes) IMG_7054.JPG (1174088 bytes) IMG_7051.JPG (1040207 bytes)
12/20/07 The front of the new addition is done.  workers have begun to lay brick walls for the locker room.
IMG_0095.JPG (1257740 bytes) IMG_0100.JPG (1135096 bytes) IMG_0101.JPG (346729 bytes) IMG_0103.JPG (1294444 bytes) 
1/04/08 The new view of the front of the fieldhouse.  Masons continue, when weather permits, laying brick in the locker room.
IMG_0172.JPG (1246543 bytes) IMG_0173.JPG (208684 bytes) IMG_0175.JPG (253386 bytes) IMG_0176.JPG (312161 bytes)
1/11/08 The exterior masonry work on locker room was completed (and an interior view).  A pump was here today pouring the concrete for the second floor addition.  Also a  view of the mezzanine level of the fieldhouse.
IMG_0335.JPG (1288891 bytes) IMG_0340.JPG (1233687 bytes) IMG_0348.JPG (262416 bytes) IMG_0341.JPG (1033298 bytes) IMG_0342.JPG (1135727 bytes) IMG_0344.JPG (1376560 bytes)
1/18/08 Roof trusses arrived today.  A view of the second floor of the east renovation and some interior shots.  More views of the football locker room and finally one of the offices on the mezzanine level of the fieldhouse.
IMG_0394.JPG (1268165 bytes) IMG_0405.JPG (1188899 bytes) IMG_0403.JPG (209858 bytes) IMG_0408.JPG (1350312 bytes) IMG_0404.JPG (1068581 bytes) IMG_0397.JPG (1132881 bytes) IMG_0398.JPG (1155498 bytes) IMG_0402.JPG (1021777 bytes) IMG_0400.JPG (1094681 bytes)
1/26/08 Roof trusses were hoisted into place this week.  Masonry work continues on the front addition and views of the mezzanine level of the fieldhouse.
IMG_0530.JPG (1177347 bytes) IMG_0532.JPG (919272 bytes) IMG_0527.JPG (1081403 bytes) IMG_0691.JPG (1197451 bytes) IMG_0697.JPG (1112708 bytes) IMG_0695.JPG (1084201 bytes) IMG_0696.JPG (973012 bytes)
2/8/08 The roof sheeting went on today on the east addition of the fieldhouse.  Interior work continues on the first floor of this addition and a view of the second story addition.  Some interior shots of new locker room.
IMG_1303.JPG (1527809 bytes) IMG_1306.JPG (1117172 bytes) IMG_1307.JPG (1268361 bytes) IMG_1309.JPG (1153312 bytes) IMG_1311.JPG (1290058 bytes) IMG_1312.JPG (246824 bytes) IMG_1315.JPG (1308356 bytes) IMG_1316.JPG (215279 bytes) IMG_1318.JPG (247564 bytes) IMG_1319.JPG (233133 bytes) IMG_1317.JPG (217374 bytes)
2/15/08 Work continues on the exterior and interior of the fieldhouse.  A view of the spouting and of the new restrooms on the first floor addition.  Finish work continues on the renovations on the mezzanine level.
IMG_1328.JPG (1066846 bytes) IMG_1332.JPG (939475 bytes) IMG_1329.JPG (1203245 bytes) IMG_1330.JPG (1280526 bytes) IMG_1333.JPG (1132280 bytes) IMG_1334.JPG (1065237 bytes) 
2/24/08 Finish work and gutters were completed on the east addition.  Some windows and doors were installed.  A view of the second floor and some of the interior of the locker room.
IMG_1607.JPG (1337021 bytes) IMG_1781.JPG (1123196 bytes) IMG_1784.JPG (1230833 bytes) IMG_1773.JPG (1362979 bytes) IMG_1775.JPG (1395791 bytes) IMG_1776.JPG (1363042 bytes)
3/14/08 Portions of the old fieldhouse entry were torn down to make way for the new addition. Framing for the walls in the east addition is in place.  A couple shots of the new locker room.
IMG_2522.JPG (1111597 bytes) IMG_2523.JPG (1219700 bytes) IMG_2525.JPG (1162596 bytes) IMG_2526.JPG (1141226 bytes) IMG_2527.JPG (964262 bytes) IMG_2529.JPG (257844 bytes) IMG_2531.JPG (1103864 bytes)
4/4/08 Work continues on additions.  Tile is being laid in the restrooms, a view of the conference room on first floor and the offices and conference room on second floor.  The football locker room got a coat of paint.
IMG_3126.JPG (1019567 bytes) IMG_3133.JPG (933002 bytes) IMG_3131.JPG (1119854 bytes) IMG_3135.JPG (989763 bytes) IMG_3136.JPG (919100 bytes) IMG_3129.JPG (1105200 bytes) IMG_3138.JPG (1164353 bytes) IMG_3141.JPG (1145227 bytes)
4/11/08 Lots of painting...the new office on second floor of east addition and locker room.  The ceiling grids are being installed in both additions as well.
IMG_3312.JPG (1132201 bytes) IMG_3316.JPG (957621 bytes) IMG_3317.JPG (1149817 bytes) IMG_3319.JPG (1356472 bytes) IMG_3318.JPG (1101214 bytes) IMG_3321.JPG (1012762 bytes)
4/18/08 Some decorative work on the facade of the east addition.  Also some photos of work in first floor and second floor.  Finally some scene of the locker room including new laundry.
IMG_3327.JPG (990854 bytes) IMG_3330.JPG (1150333 bytes) IMG_3333.JPG (928714 bytes) IMG_3331.JPG (1113213 bytes) IMG_3335.JPG (977689 bytes) IMG_3334.JPG (901301 bytes) IMG_3337.JPG (1154895 bytes) IMG_3329.JPG (1229729 bytes) IMG_3328.JPG (1022942 bytes)
4/26/08 Finishing work continues in locker room and east addition...
IMG_3829.JPG (1213611 bytes) IMG_3836.JPG (1068699 bytes) IMG_3837.JPG (951188 bytes) IMG_3838.JPG (917343 bytes) IMG_3839.JPG (1063613 bytes) IMG_3833.JPG (998140 bytes) IMG_3831.JPG (938192 bytes) IMG_3834.JPG (1070985 bytes) 
5/28/08 Finish work continues on the football locker room and in east addition. 
IMG_5578.JPG (1259621 bytes) IMG_5579.JPG (1262487 bytes) IMG_5580.JPG (897953 bytes) IMG_5581.JPG (891184 bytes) IMG_5583.JPG (951595 bytes) IMG_5584.JPG (1056223 bytes) IMG_5586.JPG (1094112 bytes) IMG_5587.JPG (1026040 bytes) IMG_5590.JPG (183291 bytes) IMG_5591.JPG (890196 bytes) IMG_5592.JPG (204354 bytes) IMG_5593.JPG (1027751 bytes)
6/16/08 Some views of the new locker room.  Most of the floor coverings are in place.  It's getting closer.
IMG_5758.JPG (1036263 bytes) IMG_5760.JPG (1044982 bytes) IMG_5762.JPG (960248 bytes) IMG_5761.JPG (955369 bytes) IMG_5764.JPG (1049674 bytes) 
8/1/08 With the football scheduled to arrive on Aug 3, the coaches have moved into their new offices and the locker room is ready for the team.  The last photos ate the basketball offices.
IMG_6685.JPG (1147131 bytes) IMG_6689.JPG (1013858 bytes) IMG_6688.JPG (1053526 bytes) IMG_6690.JPG (189156 bytes) IMG_6691.JPG (215161 bytes) IMG_6694.JPG (197860 bytes) IMG_6697.JPG (1124574 bytes) IMG_6703.JPG (986202 bytes) IMG_6704_1.JPG (1064585 bytes) IMG_6705_1.JPG (1077453 bytes) IMG_6706_1.JPG (871611 bytes) IMG_6707.JPG (891889 bytes) IMG_6698.JPG (196842 bytes) IMG_6700.JPG (847682 bytes) IMG_6701.JPG (948542 bytes) 

 
Football Field
10/5/07  Painters finished work on the new Puma Purple press box 
IMG_4456.JPG (1050270 bytes)